Factory
Takt Time for Manual Assembly Process
Signal TowerLA6

- Before
- Assembly line at a major car manufacturer.
- As assembly work is done by hand, work speed may fluctuate. At times, a worker may not be able to keep up with the main assembly line and other workers may not be fully aware of the situation or the assembly pacing.
- After
- Install a signal tower showing the work progress. By making delays clearer, awareness at the work site is improved, and supply delays are reduced. The cart travels on rails, and requires a button to send it to the next process. As the button is pressed, the signal tower is automatically reset.
Device configuration
- 21 different colors
- Flashing mode
- Easy set up from a PC
- Easy to change Takt time by changing input signal